DSEAR risk assessment that stands up to an HSE inspection

Hazardous area classification, an ATEX equipment audit and an action plan ranked by risk. York Green works in explosive atmospheres across chemical manufacturing, food production, fuel handling and process industry.

Twenty minutes, no charge. Or call 07949 084819.

Alcumus SafeContractor 16+ years DSEAR and ATEX Consultants in Cheshire and the West Midlands Professional indemnity insured

Who this is for

Get in touch if any of this sounds familiar

Most DSEAR enquiries arrive for one of three reasons. If you recognise yours here, the Greenlight Call will tell you what you need and roughly what it will cost.

Someone has asked for it

An insurer, a customer audit or the HSE has asked to see your DSEAR assessment and you do not have one that holds up.

Nobody has classified the zones

You hold flammable liquids, gases or combustible dust and no one has ever drawn the zones or checked the equipment inside them.

You have a report that does nothing

You have an assessment that lists hazards at length and never tells you what to fix, in what order, by when.

What you get

An assessment written to be used, not filed

Every finding carries an owner, a priority and a timescale. The report is built to be handed to a maintenance team, an insurer or an HSE inspector without translation.

Does it apply to us

DSEAR reaches a long way past chemical plants

The Dangerous Substances and Explosive Atmospheres Regulations 2002 apply wherever dangerous substances are present, or are generated by the work, and could put people at risk of fire or explosion. How far the assessment goes follows the substances, the quantities and the process. These are the premises and processes we are asked about most.

Not sure whether it applies to your site? Say so on the Greenlight Call. If the honest answer is that you do not need a DSEAR assessment, we will tell you that instead of quoting for one. Sites that need both often have the DSEAR assessment and the fire risk assessment carried out in a single visit.

How it works

Four steps, no surprises

The same sequence on every site, whether it is a single plant room or a multi-process manufacturing operation.

Greenlight Call

Twenty minutes on the phone to scope the site, the substances and the equipment involved.

Scope and price

Confirmed in writing, with the turnaround date, before anyone comes to site.

Site visit

Half a day for a single plant room or fuel installation. Up to two days for a multi-process site.

Report and debrief

We walk you through the findings and what to tackle first, in what order, by when.

What it costs

£3,000 to £15,000+

Depending on site complexity, the number of dangerous substances and the zoning required. That range is published so you can budget before you enquire. Multi-site discounts are available. Scope, fixed price and turnaround date are agreed in writing after the Greenlight Call and before anyone comes to site. No hourly billing, no open-ended day rate, no extras added afterwards.

How the work is delivered

The method does not change with whoever is on site

Assessments are carried out by professionally qualified assessors working to a single documented method, with scoping and technical sign-off held centrally. You get the same standard whoever attends.

One documented method

Every assessment follows the same procedure, so two assessors produce the same report on the same site.

Technical sign-off

Every report is reviewed and signed off by a Chartered practitioner before it reaches you.

Drawings, not templates

Area classification drawings are produced to the ATEX zone definitions for your site, rather than adapted from a generic set.

Proportionate controls

Recommendations you can put into practice, sized to the risk rather than to worst-case theory.

What this assessment is written to

  • Regulation DSEAR 2002
  • HSE guidance L138, HSG140
  • Zoning ATEX zone definitions, UKEX framework
  • Where fire overlaps Regulatory Reform (Fire Safety) Order 2005

Assessments are carried out by professionally qualified assessors and technically reviewed before the report reaches you. Between them our assessors bring 25+ years in health, safety, fire and environmental management, including 16+ years of DSEAR and ATEX work across chemical manufacturing, food production, logistics and high-hazard process industries. Registrations and CVs are available on request.

Proof

What clients say

“York Green brought clarity to a complex environment. Their site work was professional, their report clear and practical, and their recommendations have given us real confidence in how we manage fire and explosion risks.”

Nick Cooke, H&S Manager, Enfinium

Independently assessed

We are audited on the same terms we audit you on

Alcumus SafeContractor Approved
Our own health and safety management is independently audited by Alcumus and reassessed every year. Membership number and certificate available on request.
Assessed by an SSIP member scheme
SafeContractor is an SSIP member scheme, so our assessment is recognised by other SSIP schemes and can be validated through the SSIP portal without a second audit.

Straight answers

Questions we get asked on the call

What is DSEAR, and does it apply to my business?

The Dangerous Substances and Explosive Atmospheres Regulations 2002 require employers to assess and control the risks from substances that could cause a fire, an explosion or a similar energetic event. A dangerous substance under DSEAR covers flammable liquids and solvents, flammable gases including LPG and natural gas, combustible dusts including flour, grain, wood and metal dusts, explosive substances and oxidising substances. If any of those are present at your workplace, even in small quantities, DSEAR applies. There are very few exemptions, and not knowing about the regulations does not reduce the duty.

Is a DSEAR assessment a legal requirement?

Yes. DSEAR 2002 places a legal duty on employers to assess any workplace where dangerous substances are present. It is enforced by the Health and Safety Executive, which can issue improvement notices and prohibition notices and can prosecute. The assessment also has to be reviewed whenever the workplace, the substances or the processes change significantly.

Is this the same thing as ATEX zoning?

Zoning is part of it. DSEAR is the UK regulation that places the duty on you. ATEX supplies the technical framework used to meet that duty, particularly hazardous area classification and equipment selection. DSEAR sets the duties you have to meet. The hazardous-area and equipment standards then shape how classified areas, and the equipment inside them, are designed and managed. Since the UK left the EU, DSEAR remains UK law and the equivalent UKEX framework carries the equipment standards.

What is hazardous area classification?

It divides the workplace into zones according to how likely an explosive atmosphere is to be present. For gases, vapours and mists: zone 0 where it is present continuously or for long periods, zone 1 where it is likely in normal operation, zone 2 where it is not likely in normal operation but may occur. For combustible dusts the equivalents are zones 20, 21 and 22. Once the zones are set, any equipment operating inside them has to be suitable for that zone. The drawings record where the boundaries fall and form a large part of your compliance evidence.

Do you produce the classification drawings?

Yes. Drawings are produced as part of the assessment, or your existing drawings are reviewed and corrected where they no longer match the site.

Do I need DSEAR as well as a fire risk assessment?

Yes, and one does not replace the other. A fire risk assessment covers general fire safety: means of escape, detection, alarm systems and the risk to occupants. DSEAR deals with the substances that could cause a fire or explosion in the first place, and goes further by requiring hazardous area classification, an assessment of ignition sources and a review of whether the installed equipment suits the zone. The two overlap on most sites, so we carry them out in a single visit where that works.

How often does an assessment need reviewing?

Whenever there is reason to think it is no longer valid. That means a change in the substances or the quantities held, new processes or equipment, a near miss or an incident, or a significant change to the layout of the site. Many organisations also review every three to five years as a matter of good practice. We can carry out periodic review visits to keep the documentation current.

Who is allowed to carry one out?

DSEAR requires a competent person: someone with the knowledge, skills, training and experience to identify and assess the risks from dangerous substances. There is no single mandatory qualification. In practice competence is shown through formal health and safety qualifications, specialist DSEAR and ATEX training and a record of assessments in comparable environments. York Green assessments are carried out by professionally qualified assessors, with scoping and technical sign-off held by a Chartered practitioner.

How much time will you need on site?

Half a day for a single plant room or fuel installation. Up to two days for a multi-process manufacturing site. It is agreed on the Greenlight Call, so there is no open-ended day rate.

What does it cost?

The published range is £3,000 to £15,000+, depending on the substances, the number of processes and the zoning required. You get a fixed figure in writing after the Greenlight Call. Multi-site discounts are available.

Where do you cover?

Consultants are based in Cheshire and the West Midlands, and most of our work sits in the corridor between them: Staffordshire and Stoke-on-Trent, the North West and Merseyside, Shropshire and the Midlands, and across into Yorkshire. Beyond that corridor we work nationwide, and have delivered assessments as far as London, Lincoln and the South Coast. Wherever the site is, the price you are quoted after the Greenlight Call is the price.

There is a DSEAR checklist and a guide to the zones in our free resource area.

York Green

Next step

Tell us about the site

Five boxes, about a minute. Every enquiry is read by a consultant rather than a call centre, and we come back to you within one working day with a scope and a fixed price. If the honest answer is that you do not need a DSEAR assessment, we will tell you that instead of quoting for one.

  • Reply within one working day
  • Fixed price in writing, no hourly billing
  • Turnaround date agreed before we start